Determining the conduction efficiency of canal works is a priority for the Empresa de Aprovechamiento Hidráulico de Villa Clara because it is one of the indicators of the INRH's state mandate. The main purpose of this study was to calculate the efficiency and losses in the selected sections of the Calabazar-Purio master canal in order to verify the volumes of water lost during conveyance at the points of delivery to users. Gauging measurements were made with hydrometric windlasses, which made it possible to determine the flow rates at the inlets and outlets of the sections in order to determine losses. Based on the calculations made, a conduction efficiency of 89% was obtained in the section, which is close to the design parameters under optimum conditions.
Resumen
La determinación de la eficiencia en conducción de las obras en canales es una prioridadpara la Empresa de Aprovechamiento Hidráulico de Villa Clara por formar parte de uno de los indicadores del encargo estatal del INRH. El propósito fundamental de este estudio fue calcular la eficiencia y pérdidas en los tramos seleccionados del canal magistral Calabazar-Purio con el objetivo de verificar los volúmenes de agua que se pierden durante la conducción en los puntos de entrega a los usuarios. Se realizaron mediciones de aforo con molinetes hidrométricos, lo que permitió determinar los caudales a las entradas y salidas de los tramos para determinar las pérdidas. A partir de los cálculos efectuados se obtuvo una eficiencia en conducción en el tramo de un 89 % que se encuentra cercana a los parámetros de diseño en condiciones óptimas.
About The Speaker
Yunaisy Rodríguez Correa
Directora Adjunta EAH-VC
eah.da@vc.giat.cu
Avenida Libertadores # 201, % Jesús Menéndes y Danielito, Santa Clara. Villa Clara. Cuba.
(53) 42 20 5615 | https://eah.vc.giat.cu